This is the login for Trane® Connect™ and other Trane® commercial applications. Trane® Connect™ is our secure, cloud-based customer portal to access your building systems to remotely monitor and manage building systems, and conduct routine maintenance.
Trane upgraded six luxury NYC buildings to comply with LL97, reducing annual carbon emissions by 3,633 metric tons (equivalent to 9.3M miles driven) and saving 5.2M kWh.
Trane's advanced ice plant solution for Manning Sports Centre Arena reduced costs, improved energy efficiency, and enhanced ice quality, helping to position the facility for long-term success.
The Calvert County Career and Technology Academy resolved a chiller failure with Trane’s help, using a rental unit and installing a cost-effective, efficient Trane RTAC Helical Rotary Chiller.
Oak Hill Country Club collaborated with Trane to replace their HVAC system ahead of the 2023 PGA Championship. The successful project showcased teamwork, cost-effectiveness, and future readiness.
The US Air Force recently commissioned its first LNG plant at a strategic air base, aiming to improve energy efficiency and reduce costs. Learn how a collaboration with Trane, the Defense Logistics Agency, Tokyo Gas Engineering Solutions, and the 35th Fighter Wing resulted in a journey of resiliency and innovation.
EnerSys, a leader in climate technology, is committed to decarbonizing their operations. They are collaborating with Trane for a comprehensive program to reduce emissions and increase electrification across their facilities.
Alpena Public Schools in Alpena, Michigan, faced aging facilities and infrastructure which negatively impacted the learning environment for its 3,900 largely rural students.
Collaboration with a national retailer leads to the development of a customized tool to integrate data and provide tailored building management across 600 locations, generating 20% energy and $5 million cost reduction annually.
Family-owned movie theater brand in San Antonio elevates the movie-watcher’s experience with a focus on comfort and energy efficiency. Upgraded equipment and building controls enhance thermal comfort, acoustics, lighting, and air quality – all while saving funds to go back to the community.
Holt Public Schools uses a guaranteed energy savings performance contract (ESPC) to implement lighting, controls, and water conservation upgrades across nine buildings. The district is honored by the Department of Energy and expected to save $3M in 12 years.
Norton County Hospital replaced its 20+ year-old, undersized chiller to meet year-round cooling needs, resolving comfort and reliability issues, especially in summer.
With an aging infrastructure and a building automation system challenged to synergize a variety of different mechanical systems for optimal operations, the Grand Hyatt® New York sought solutions to help achieve its sustainability goals, while improving its financial performance.
MC Realty collaborates with Trane on an innovative equipment installation approach – opening a hole in 4900 Main Office’s roof. The team replaced air handling units, controls, and a condenser water system, saving $130,000 saved annually and redeeming tenant comfort.
The Albert Gallatin Area School District in Fayette County, Pennsylvania, successfully enhanced the comfort of students and staff while improving academic performance at Albert Gallatin High School. By adopting Trane Performance Contracting and utilizing state funding through PA Act 39, the school achieved a 20% reduction in total utility costs.
Hall County Government Center in Gainesville, Georgia, optimized occupant comfort, increased energy efficiency, and improved indoor environmental quality with a holistic solution.
Midland Independent School District is home to 28,000 students across 38 schools. Through collaboration with Trane and funding from Elementary and Secondary School Relief (ESSER), the district will replace aging equipment, upgrade building automation systems, and improve indoor air quality. The result? A more comfortable and effective learning environment.
A collaboration between Knox County Schools and Trane saves the district more than $74 million. The partnership resulted in energy improvements to 90 schools, including updated HVAC systems, controls, LED lighting, and more.
An industry leader in the collection and processing of life-saving biological material sought expert guidance on how to advance progress towards Greenhouse Gas (GHG) emission reduction goals. After implementing Trane® Autonomous Control powered by BrainBox AI® in more than 120 donation and collection facilities, Trane Autonomous Control has reduced 1,132 mtCO2e and has resulted in $329k in energy cost savings in the first 18 months of operation.
Jasper County Jail collaborated with Trane to reduce energy costs, reduce energy usage, and create a more comfortable living space for its occupants. A holistic assessment resulted in a sealed building envelope, upgraded building automation systems, LED lighting, solar, and more.
Two-thirds of the 600,000 square foot research-intensive Roger Guindon Hall is consumed with wet labs. The building houses the University of Ottawa’s Faculty of Medicine and Faculty of Health on an 80-acre Health Sciences Centre that also includes the Ottawa General Hospital, the Children’s Hospital of Eastern Ontario and the Royal Ottawa Regional Rehabilitation Center.
Trane and Arnprior Regional Health partner to improve indoor environmental quality for hospital occupants in the second phase of a multi-phase program. Read how this award-winning project resulted in improved lighting, indoor air quality, and thermal comfort, as well as system reliability, energy efficiency, data analytics, and more.
Arnprior Regional Health partners with Trane to improve infrastructure system reliability, lower maitenence costs, and reduce greenhouse gas emissions in the first phase of a multi-phase program. The team used energy savings performance contracting and high efficiency boilers to meet their goals - all while keeping critical operations running.
Upgrades to Cyxtera’s chiller plant and pumping system controls led to a decrease in energy consumption of 0.7 kW/ton, resulting in over $2,100,000 in annual energy cost savings.
In 2001 Allen County Public Library (ACPL), one of the top U.S. libraries, and its 14 locations had a varied collection of HVAC systems, controls, fire alarm, access, security and other systems. With the planned addition of 127,000 square feet and renovation of 240,000 square feet at the main library in Fort Wayne, ACPL used the opportunity to upgrade, standardize and integrate buildings, systems and equipment.
A leading High-Tech Manufacturer relies on Trane Rental Services for new facilities. The manufacturer sought a trusted collaborator in system design, customer service, and comprehensive rental solutions.
In alignment with its sustainability commitment, Fayetteville State University implemented performance guarantee contract upgrades to improve efficiency. Early results show a verified savings potential of $927,908 in energy, water, operations and maintenance costs.
Majestic Management manages the major share of private leasable office space in Prince George, BC, including the HSBC Tower. Wishing to upgrade its portfolio, the firm implemented a turnkey design/build project at the building that resulted in a 50 percent energy savings and $100,000 in incentives.
Swiss Hills Career Center faced comfort issues and high costs due to aging infrastructure. Trane provided a comprehensive solution, upgrading HVAC systems, lighting, and controls, resulting in improved comfort, efficiency, and estimated energy savings of 30%.
Hillsborough Community College leaders developed and implemented a comprehensive five-year plan with Trane which enabled the College to upgrade systems, controls and implement preventative maintenance, saving nearly $1.8 million in energy costs and nearly 23 million kWh over the past five years. The College also reduced its environmental footprint and improved IEQ throughout their five campuses and district administration building.
Learn how Trane's BTU Crew program empowered students at Beloit USD 273 to drive energy-efficient upgrades and improve indoor environmental quality (IEQ) in their school buildings. Through this unique public-private collaboration, students gained real-world learning experiences in data analytics and STEM, leading to improved comfort, reduced CO2 levels, and elevated STEM education.
Wastewater Treatment Plant and Booster Pump and station upgrades collectively reduce energy use by 122,786 kWh a year, saving $10,400 annually, and qualify for incentives of nearly $23,000.
Located on a glorious hilltop near the San Gabriel Valley Mountains, the high-traffic Pacific Palms Resort welcomes US and international guests to metro Los Angeles. The 650-acre resort caters to both business and leisure travelers, with the bulk of its business attributed to conferences.
Chiller solution answers efficiency and capacity needs, while adhering to budget requirements; results in energy savings and a $16,000 utility company rebate.
Established in 1897, Scott & White Healthcare, now a part of Baylor Scott & White Health, is a leading health care system, encompassing one of the nation's largest multi-specialty group practices that provides personalized, comprehensive health care enhanced by medical education and research. Located on a 98-acre campus, the system’s 119-bed hospital in College
Station, Texas, specializes in treating patients experiencing chest pain and heart attacks.
Merrick & Company renovated a three-story, 105,000 sq ft building for its new headquarters location. The new VAV system at Merrick & Company helps maintain desired office temperatures, while saving energy.
The New York City Center sought to upgrade its HVAC systems and controls to improve energy efficiency and reliability, enhance air quality and increase comfort.
Central energy plant and controls system improve comfort, lower service costs, reduce energy use 20 percent; savings to be reinvested in medical equipment.
Explore how the Science Museum of Minnesota embraced a holistic approach to building comfort with Trane's heat recovery solutions. Discover how the museum's heat recovery retrofit captured waste heat, significantly lowering heating bills by 75% and saving nearly $300,000 annually.
The Neiman Marcus Group (NMG) partnered with Trane Technologies to revolutionize luxury retail and achieve ambitious sustainability goals. By replacing outdated absorption chillers with energy-efficient Trane electric chillers, NMG significantly decarbonized its iconic Bergdorf Goodman Women's Store in New York City.
ARRIS Group requires 99% uptime for their global data center. Trane provides a system-integrated service with central monitoring of 69 critical points and custom performance metrics. The HVAC includes 54 rooftop units, a 225-ton chiller, and Trane Tracer™ controls.
Learn about how Trane collaborated with Cape Augusta Digital Properties (CADP) to design a state-of-the-art data center in Augusta, Georgia, leveraging the Augusta Canal for free cooling and hydropower.
Learn how Owensboro Health in Kentucky achieved significant energy savings and improved patient comfort with Trane's comprehensive energy management solutions.
Holistic approach, chiller plant redesign, and optimized controls result in improved comfort, lower energy and operational costs; cost/occupied room reduced by 41 percent.
Hopkins County Jail quickly upgraded HVAC systems with Trane, improving safety, energy efficiency, and system reliability, while reducing downtime and costs.
With Trane’s solutions, Golden Properties upgraded their aging chillers, achieving a 73% energy use reduction at the 1177 West Hastings office building.
Willoughby-Eastlake leaders undertook a high performance building approach, working with Trane and GE Lighting to accomplish its mission of improving the learning and teaching environment throughout the district.
Wendy’s cut energy use by 24% through efficient HVAC upgrades. Collaborating with Trane, they aim for a 20% reduction across new and retrofitted locations.
Trane partnered with the U.S. Forest Service to implement off-grid mobile solar PV systems and LED lighting in five California fire facilities. This collaboration improved power-system function, reduced GHG emissions, and achieved nearly $3.8 million in cost savings, advancing federal sustainability goals and enhancing operational efficiency.
When the lack of air conditioning, outdated HVAC systems and the absence of security cameras jeopardized the comfort and safety of students and staff, the school district sought ways to upgrade its facilities.
District-wide implementation of building management system and energy services aligns with energy policy; improves learning environment; lowers maintenance costs; results in year-over-year energy savings of $130,000.
Boles ISD, facing budget cuts and a growing student population, partnered with Trane and TCPN to build a cost-effective, energy-efficient science lab, enhancing educational facilities and resources.
A 100-ton high efficiency Trane water-cooled chiller provides Homestead-Wakefield Elementary with a comfortable classroom environment and energy savings.
Grace United Methodist Church replaced its aging chiller/boiler system with Trane Advantage VRF systems, improving comfort, reducing energy costs, and enabling precise, quiet temperature control.
Lighting upgrades, installation of building automation system, and implementation of demand limiting triage controls strategy result in significant reduction in electricity costs; decrease peak demand by 64 percent.
Kneehill County’s Ron Gorr Memorial Arena in Torrington, Alberta, transformed its aging ammonia chiller plant into a safer, more reliable, system with Trane's sustainable refrigerant solution.
Wings Over the Rockies Museum used a Trane 500,000 BTU electric heater to quickly restore heat, protect artifacts, and host events during a winter boiler failure.
Nestled on 1,400 acres in the foothills of the Blue Ridge Mountains, Clemson University implemented a complex, design/build chiller plant aligned with its commitment to sustainability, and tailored to the scenic terrain and needs of its more than 17,000 students.
Faced with a chiller failure before Fashion Week, Saks Fifth Avenue called on Trane. Trane installed a rental chiller using a creative steel structure solution, ensuring comfort and saving the event.
The grocery chain needed a single-source provider for HVACR and maintenance. Nelson and Trane’s successful pilot improved facilities and cut costs, expanding to 43 more stores.
The hotel sought to implement upgrades to reduce costs, capitalize on local utility company incentives and improve temperature, humidity and indoor air quality for the comfort of its guests.
Jefferson Community College enhances student and community life through quality teaching, innovative services, and partnerships. It offers credit programs, workshops, cultural events, and counseling. Serving a rural area with Fort Drum nearby, the college has seen a 30% enrollment increase in seven years due to high unemployment and retraining needs.
White Castle Restaurants, famous for its mouth-watering hamburgers, faced the classic restaurant dilemma. Poorly ventilated kitchens can drive cooks and employees from the cooking areas, leading to production delays, quality problems, increased employee turnover, and ultimately reduced repeat business.
One-stop solution enables fast construction of seasonal outdoor skating rink; provides high-quality ice, even as temperatures warm; helps increase revenues by $50,000.