Customer Story
Cyxtera Data Center: Energy-Efficient Cooling and Cost Savings
Upgrades to Cyxtera’s chiller plant and pumping system controls led to a decrease in energy consumption of 0.7 kW/ton, resulting in over $2,100,000 in annual energy cost savings.
Customer Story
CoreSite Realty Corporation
CoreSite recently delivered its twelfth data center, the second of four planned data centers at its Santa Clara campus.
Customer Story
Ford Motor Company
Implementing an energy efficient, sustainable and reliable chiller plant at Ford’s Dearborn campus reduced their energy use by 540,288 kWh per year.
Customer Story
ARRIS Group, Inc.
ARRIS Group requires 99% uptime for their global data center. Trane provides a system-integrated service with central monitoring of 69 critical points and custom performance metrics. The HVAC includes 54 rooftop units, a 225-ton chiller, and Trane Tracer™ controls.
Customer Story
Sustainable Data Center Solutions for Cape Augusta Digital Properties
Learn about how Trane collaborated with Cape Augusta Digital Properties (CADP) to design a state-of-the-art data center in Augusta, Georgia, leveraging the Augusta Canal for free cooling and hydropower.